Site Conditions for Shoring Work and Materials Needed for Secant Shoring
When a building is built on sandy soil or soft ground, at such times, it becomes necessary to construct a secant pile wall. Secant pile wall, ensure that the structure behind the wall would remain proper and it won't have the risk of falling due to high lateral pressure working. This work is carried under the expert supervision of a quality engineer, construction manager, safety officers, and skilled labor. For this work, rotary drilling rigs ensure that the soil remains firm and the surrounding structures are not disturbed. This article will explain the site conditions for performing the shoring work and the material needed to construct sheet piles in Dubai . Site condition for shoring work The subsurface of the area is made up of loose sand accumulating on the top layer. The medium and the layer below are made up of the formation of calcarenite and sandstone over time. The reason to construct ...